4.0 LITRE WATER PUMP MACHINING LINE

The 4.0 Litre Water Pump machining equipment was purchased from: R&B for machining operation; Antares and Ingersoll-Rand assembly, inspection and wash operations.

Operation Description Equipment
310 Machine water pump - Complete
Machine: 11 station dual machine
(1)working machine

Machine cycle time = 24.0 seconds
Pieces per hour = 150

R & B
320 Parts washer.
(1) working machine

Machine cycle time = Continuous

Ingersoll-Rand
330 Air leak test housing.
(1) working machine
Antares

Machine cycle time = 7.0 seconds
Pieces per hour = 514

10 Assemble water pump (cup plug, shaft & bearing,
impeller, seal, hub & housing), Leak test and torque
spin test.
Machine: 9 station dial machine. (1)working machine

Machine cycle time = 24.0 seconds
Pieces per hour = 150

Ingersoll-Rand
20 Air leak test pump assembly
(1)working machine

Machine cycle time = 3.6 seconds
Pieces per hour = 1000

Antares

Please contact Gibbs Machinery Company, Joe Gibbs via email at joeg@gibbsmachinery.com for more information.